Maasvlakte Power Plant
- Project:
- Maasvlakte Power Plant (MPP3),
The Netherlands - Construction period:
- 2008-2009
- Client:
- E.ON Kraftwerke GmbH
- Consultant:
- E.ON Engineering GmbH
- Contractor:
- Haverkort Voormolen BV
- Products used:
- HRC T-headed bars
Construction site
Base plate with T-headed shear reinforcement
Placing of T-headed shear reinforcement