E18 Bjørvika tunnel
- Project:
- E18 Bjørvika Tunnel
- Construction period:
- 2005-2010
- Client:
- Statens Vegvesen
- (Norvegian Road Administration)
- Consultant:
- Dr.Ing.Aas-Jakobsen AS
- Contractor:
- AF Bjørvikatunnelen
- (Skanska Norge AS, BAM, Volker Stevin Civil)
- Products used:
- HRC 410/420 Mechanical Couplers
- HRC 150 T-Headed Bars

Two tunnel-elements at production site in Norway (Foto: Byggindustrien)

HRC 420 couplers with protecton caps, some with nail on flange

HRC 420 female coupler with nail on flange

A tunnel element is beeing transported into the Fjord of Oslo